CLASSI PRESTAZIONALI IN Dop

For the successful completion of the work, it is essential to:

  CC50 CC51 CC52 CC53 CC54 CC55
NET LIGHT (A) in cm 350 450 550 650 1000 840
OUTER SPAN (B) in cm 369 469 569 669 1040 880
NET LIGHT SPAN (C) in cm 341 541 641 1000 840
DOME HEIGHT (H) in cm 160 194 228 198 337 282
N° OF ELEMENTS 6 8 9 11 24+12 21+11

For the successful completion of the work, it is essential to:

  • Waterproof the curb on which the dome will be positioned, taking care to fold the membrane horizontally.
  • Fold a second waterproof membrane inside the curb C-profile of the dome structure.
  • Ensure that the working area surrounding the dome's support plane is completely free from obstacles that could hinder the assembly process.
  • The activities mentioned above are the responsibility of the client and are therefore not included in the supply.
CC50CC51CC52CC53CC54CC55
NET LIGHT (A) in cm3504505506501000840
OUTER SPAN (B) in cm3694695696691040880
NET LIGHT SPAN (C) in cm3414415416411000840
DOME HEIGHT (H) in cm160194228198337
N° OF ELEMENTS6891124+1221+11

INGOMBRO CILINDRO IN APERTURA

IDEAL FOR LARGE SURFACES
STEEL AND POLYCARBONATE ENSURE DURABILITY AND RELIABILITY

Related Products

No related products found.

Related Case Studies

A zero-risk warehouse
Discover More
A zero-risk warehouse
An important player in the storage, handling, and archiving industry requested our intervention for the smoke disposal system of their intensive warehouse, which is 22 meters high. Beyond 20 meters in height, active fire protection is guaranteed by installing smoke disposal systems that comply with the criteria set out in the new Fire Prevention Code.
NSHEV for “Fashion” Logistics
Discover More
NSHEV for “Fashion” Logistics
An industrial building constructor understands that the characteristics of the roof installation that they are doing for a well-known fashion brand go beyond their expertise. They need a partner to interpret the fire protection project specifications and implement them.